Saint Barbara for the Opevnění Motorway Tunnel
On Wednesday, January 21, the boring of the Opevnění motorway tunnel was ceremonially lunched. It is being carried out by division 1 and Metrostav TBR. As part of the ceremony, the traditional blessing and placement of a statuette of Saint Barbara, the patron saint of miners, took place. The twin-tube tunnel, with a length of 492 meters, will form part of the 21-kilometer section of the D1 between Trutnov and the border with Poland, whose construction is led by MI Roads. Division 1 was represented by its director, David Cyroň.


