Saint Barbara for the Opevnění Motorway Tunnel

Saint Barbara for the Opevnění Motorway Tunnel

On Wednesday, January 21, the boring of the Opevnění motorway tunnel was ceremonially lunched. It is being carried out by division 1 and Metrostav TBR. As part of the ceremony, the traditional blessing and placement of a statuette of Saint Barbara, the patron saint of miners, took place. The twin-tube tunnel, with a length of 492 meters, will form part of the 21-kilometer section of the D1 between Trutnov and the border with Poland, whose construction is led by MI Roads. Division 1 was represented by its director, David Cyroň.

More news

All news