Relocation of a water pipeline during the construction of a tram line in Prague
Since last summer, division 3 has been working with divisions 1 and 4 on the new tram line Divoká Šárka – Dědinská in Prague. The construction also includes the relocation of a water supply pipeline, which was carried out by division 4 in Drnovská street. The cast iron pipeline with a diameter of 1 200 millimeters and a length of over 150 meters passed a pressure test and was connected to the water supply network at the beginning of December.


