Kramer Tunnel Shaft Reaches Full Depth

Kramer Tunnel Shaft Reaches Full Depth

Below the German Kramer highway tunnel in Garmisch-Partenkirchen is a one-of-a-kind ventilation shaft, 4.5 meters in diameter. In January, Division 1 and BeMo Tunneling finished the excavation, 84 meters under the terrain level. Works have been suspended in order to protect local birds; construction should resume in July with the casting of the secondary lining.

More news

All news