Breakthrough of the Milochov Tunnel in Slovakia
On Monday, September 7, the double-track Milochov Tunnel, a part of the modernized Púchov – Považská Teplá railway line, was broken through. The ceremony at the western portal featured Slovak minister of transport and construction Andrej Doležal and other guests. The 1,861-meter long tunnel, which goes through Stavná Hill, has been excavated by division 1 since 2018.


