Upgrade of no. 2 Track, Section Brno-Královo Pole – Kuřim

04/2015–10/2016

Client:
Správa železniční dopravní cesty, státní organizace
Designer:
SUDOP Brno, spol. s r.o.
Contractor:
Subterra a.s. and OHL ŽS, a.s.

Almost 9 kilometres long section between Brno-Královo Pole – Kuřim is located on the regional railway line from Brno to Kutná Hora. The purpose of the upgrade was an increase of the speed between stations to a maximum of 120 km/h. The upgrade consisted of the replacement and improvement of the track superstructure and substructure. The overhead line, communication and safety equipment was modernized and several bridges and culverts were upgraded. The stops Česká and Řečkovice were also upgraded, new lighting and information system was installed. The platforms provide disabled access.

Almost 9 kilometres long section between Brno-Královo Pole – Kuřim is located on the regional railway line from Brno to Kutná Hora. The purpose of the upgrade was an increase of the speed between stations to a maximum of 120 km/h. The upgrade consisted of the replacement and improvement of the track superstructure and substructure. The overhead line, communication and safety equipment was modernized and several bridges and culverts were upgraded. The stops Česká and Řečkovice were also upgraded, new lighting and information system was installed. The platforms provide disabled access.