Underground Construction

Photo gallery

Construction Progress in November 2009
2009

Construction Progress in October 2009
2009

montáž ocelových konstrukcí

Construction Progress in May 2009
2009

Placing of St. Barbara Statue
2008

Construction Progress in May 2008
2008

Excavation of Underground Utility Tunnel - February 208
2008

Construction Progress in July 2007
2007

 

Adaptation of Underground Utility Tunnel, Line C, Wenceslas Square

Investor:Kolektory Praha, a.s.
Designer:Ingutis s.r.o.
Contractor:Sdružení MENASU – Metrostav a.s. Navatyp a.s.,Subterra a.s.
Implementation period:1. July 2007 - 1. September 2009
Adaptation of Underground Utility Tunnel, Line C, Wenceslas Square

The works included a reconstruction of the existing utility tunnel. At first the existing water mains DN 200, 300, 500, 700 were dismantled and then the excavation works were done to achieve the required cross-section profile. The excavation was carried out under the protection of a jet grouting which was carried out from the surface. The reconstructed utility tunnel was equipped with standard steel racks and with technologies needed for future use by Kolektory Praha a.s..