Our projects
Karviná - Extension of Sewer

Karviná - Extension of Sewer

Subterra a.s. constructed an underground utility tunnel Alfa (418m long), sewer collector C and sewer section A2 in the length of 1958m....
Railway Line Upgrade, Section Czech/Slovak Border-Mosty u Jablunkova-Bystřice nad Olší

Railway Line Upgrade, Section Czech/Slovak Border-Mosty u Jablunkova-Bystřice nad Olší

Location: 3rd transit railway corridor Bohumín – Čadca 

The purpose of the refurbishment was an increase of the speed on the railway line to a maximum of 160 km/h....

Regeneration of Blocks of Flats Lupáčova

Regeneration of Blocks of Flats Lupáčova

The project included the construction of an additional storey, the overall regeneration of blocks of flats (application of thermal insulation, replacement of indoor...