Menu
 
Newsletter
 
Zpravodaj Subterra, prosinec 2016
Zpravodaj Subterra, prosinec 2016
Our projects
Underground Utility Tunnel - Centrum I.A, Stage 0004, Vodičkova

Underground Utility Tunnel - Centrum I.A, Stage 0004, Vodičkova

Location: Prague 1, Prague 2

The utility tunnel is positioned about 10-12m below the existing ground level. The main tunnel is 794m long. From the main tunnel there...

Railway Line Upgrade - Veselí nad Lužnicí - Tábor, Phase 1, Section Doubí u Tábora – Tábor

Railway Line Upgrade - Veselí nad Lužnicí - Tábor, Phase 1, Section Doubí u Tábora – Tábor

The purpose of the upgrade was an increase of the speed on the railway line to a maximum of 160 km/h and increase of the transport capacity. This was achieved by the...

Construction of Rezidence Melicharka, Brandýs nad Labem

Construction of Rezidence Melicharka, Brandýs nad Labem

Construction of four residential buildings with 52 apartments
Regeneration of Blocks of Flats Lupáčova

Regeneration of Blocks of Flats Lupáčova

The project included the construction of an additional storey, the overall regeneration of blocks of flats (application of thermal insulation, replacement of indoor...