Our projects
Adaptation of Underground Utility Tunnel, Line C, Wenceslas Square

Adaptation of Underground Utility Tunnel, Line C, Wenceslas Square

The works included a reconstruction of the existing utility tunnel. At first the existing water mains DN 200, 300, 500, 700 were dismantled and then the excavation works...

Railway Line Upgrade, Section Bystřice nad Olší–Český Těšín

Railway Line Upgrade, Section Bystřice nad Olší–Český Těšín

Location: 3rd transit railway corridor Bohumín – Čadca, from border between Czech and Slovak Republic to Dětmarovice 

The purpose of the upgrade was an increase of...

Reconstruction and Extension of Residential Complex Kejřův Mill, Praha 9

Reconstruction and Extension of Residential Complex Kejřův Mill, Praha 9

Kejřův Mill consists of seven buildings. Three of them are original – the villa, the grinding plant and the granary. Four of them are newly built. In total there are 78...
Construction of Flood Control Measures, Stage 0006, Zbraslav – Radotín, Section 13 Zbraslav – North

Construction of Flood Control Measures, Stage 0006, Zbraslav – Radotín, Section 13 Zbraslav – North

The works included the construction of flood walls and relocation of utilities. Flood wall is designed as the prefabricated reinforced concrete wall combined with...