Our projects
Adaptation of Underground Utility Tunnel, Line C, Wenceslas Square

Adaptation of Underground Utility Tunnel, Line C, Wenceslas Square

The works included a reconstruction of the existing utility tunnel. At first the existing water mains DN 200, 300, 500, 700 were dismantled and then the excavation works...

Upgrade of Railway Line Piešťany - Nové Mesto n. V, Slovakia, 47.55 to 100.5km

Upgrade of Railway Line Piešťany - Nové Mesto n. V, Slovakia, 47.55 to 100.5km

 

Location: V. railway corridor (Bratislava - Žilina - Čierná nad Tisou)

The main objective of the project was to increase the line speed up to 160km/h and to...

Construction of Rezidence Melicharka, Brandýs nad Labem

Construction of Rezidence Melicharka, Brandýs nad Labem

Construction of four residential buildings with 52 apartments
Faculty of Architecture, Czech Technical University in Prague

Faculty of Architecture, Czech Technical University in Prague

Subterra a.s. delivered and installed ventilation, cooling and heating systems and steam conduit.
 
The project was designed to use natural...