Our projects
Construction of Underground Utility Tunnel Koliště, Brno

Construction of Underground Utility Tunnel Koliště, Brno

The contract consists of two parts. In the area of Teplárny Brno new access shafts (diameter 4.2 m, depth about 17m), were built. This shaft enabled connection to the...
Refurbishment of Railway Line, Section Budapest-Kelenföld–Tárnok, Hungary

Refurbishment of Railway Line, Section Budapest-Kelenföld–Tárnok, Hungary

The railway track Budapest - Kelenföld - Tárnok is a part of the fifth trans-European railway corridor. The purpose of the reconstruction is to achieve a speed of 160 km/h...

Reclamation of Podkrušnohorská Spoil Dump (Phase XII)

Reclamation of Podkrušnohorská Spoil Dump (Phase XII)

Continuation of the reclamation of Podkrušnohorská Spoil Dump (area of 116,8 hectares) where brown coal mining activities were carried out. An open surface drainage...